The primary criterion for a wind tunnel is flow quality: measurements in the test section are reliable only when the velocity is uniform and the turbulence stays below a threshold. Deviations originate upstream of the test section — the fan, the diffuser, the settling chamber, the flow straighteners and the contraction.
The paradox of this kind of equipment: flow quality can only be measured once it has been built, yet the causes lie in dimensions that must be fixed at the start. Correcting it afterwards means cutting and re-welding the tunnel body.
These are the earliest projects in the CFDWAYS record and also where the later way of working took shape: define measurable criteria first, simulate the whole circuit instead of truncating the scope, and settle the geometry while the drawing can still be changed — before any steel is cut.




Wind tunnels, test chambers, calibration towers — flow quality should be settled on the model before the fabrication drawing is frozen.
Related projects: HVAC & building environment · HVAC & building design industry · Automated design optimization